
738 037 €
738 037 €
| Sale price | 738 037 € |
| Price per square meter | 5 677.21 € |
| Floor area | 130 m² |
| Number of bedrooms | 3 |
| Number of bathrooms | 3 |
| Address | Andorra, Andorra la Vella |
130 m 2, 3 Habitacions, 3 Banys, No Inclòs
The property is an apartment building located in one block on Antic Camí Ral, in the new zone of the city of Andorra la Vella, opposite the Estadi Comunal and next to the Camí Riu Valira, close to the new bus station. The area has a developed infrastructure: educational, cultural, sports, social facilities, as well as commercial and service institutions. The entire development is represented by multi-apartment and administrative buildings.
The construction of the building will be aimed at achieving high energy efficiency, preserving the environment, quality and climatic comfort inside the housing. To reduce energy consumption, the facades, roof and interiors are designed with maximum thermal insulation. For sound insulation, all windows will be made of triple glass with an air gap, which also improves thermal insulation. Motorized aluminum roller shutters with thermal insulation will be installed in the bedrooms, living room and kitchen. The house is heated using the "district heating" system provided by Feda.
The floor will be laid with Eureka AC6 class laminated parquet, 12 mm thick, with white skirting boards. In the bathrooms and toilets, the walls and floors will be finished with ceramic tiles from Keraben. Faucets with a water-saving system will be installed. The plumbing will be from Laufen, the “Pro” model is wall-hung. Each bathroom will have a Syan shower tray, the parameters and color of which depend on the room. The bedrooms and hallways have built-in wardrobes made of white lacquered wood. All doors, except glass ones, will also be white, glass - with a matte finish at the owner's request.
The kitchens will be tiled, similar to those in the bathrooms, and the remaining walls will be covered with a double layer of white paint. They will feature modern furniture with upper and lower cabinets equipped with LED lighting to improve illumination of the work area. The façade and work surface are made of Dekton. The following set of equipment will be installed in the kitchen: - Induction hob - Pyrolytic oven - Microwave oven - Hood - Stainless steel sink with single lever mixer
Heating in each apartment is planned to be organized using underfloor heating, the density of which will be higher in areas with increased heat loss. Each apartment is equipped with a thermostat in the living room. Pre-installation for the future air conditioning system has been carried out.