ID 33651052
Price: 122,126. 40 euros
Locality: Nessebar
Rooms: 3
Total area: 92.52 sq. m
. Without a support fee!
Construction stage: ACT 14
Payment:
5,000 euro deposit,
100% upon signing the notarial deed of ownership.
The payment scheme is as follows: 40% upon conclusion of a preliminary agreement, another 40% upon receipt of act 14 and 20% upon receipt of act 16. If the bank payment is up to 50%, the underfloor heating is a gift!!!
Completion of construction is the end of 2025.
The building without a maintenance fee has five floors + one basement floor. 20 apartments, 20 parking spaces, 20 warehouses. The building has one entrance, and one high-quality elevator will be installed. The manufacturer has not yet been determined, but it will be close to high-end equipment. The building has been designed and will be built taking into account new standards and requirements from April 2024. taking into account all environmental technical and regulatory acts. It includes, among other things, the minimum dimensions of doors, the width of corridors, stairs and balconies, including for access by people with reduced mobility. Since the building is intended for year-round use, it will be maximally insulated according to all standards and requirements for maximum energy saving. In addition, when signing a preliminary contract, you can order the installation of electric underfloor heating. High-quality window frames (windows) from the famous manufacturer Rehau. The building is made of monolithic concrete, Porotherm brick partitions. The building is rented fully furnished on a turnkey basis, drywall will not be used in the finishing work of the premises (apartments). High-quality plastered walls and ceiling will be painted with laminate and terracotta on the floor. Apartments with finished entrance and interior doors, sanitary facilities and bathrooms. Air conditioning systems will be built according to the project. To ensure waterproofing, modern solutions from companies such as Gemini PGR, Pegasus Spot steam drainage membrane, and Gemini P. bitumen waterproofing will be used. The building will be equipped with LED strip facade lighting.