These sand and gravel quarries are located in the Zala district, 10 km from the M85 motorway exit and 28 km from the Hungarian-Austrian border, at 9483 Sopronkövesd.
There are two packages for sale with mining areas of different sizes.
1st mining pack
Mining quarries area
Note 52 ha sand quarry
Mineral Resources There are currently 5.2 million tonnes of minable sand in the mining area. By expanding the mining area, an additional 6.5 million tons can be obtained.
The permit for burial and disposal of inert waste is in the process of being processed. This provides the possibility of storing, recycling and recycling construction and demolition waste.
Note 30.7 hectares - gravel quarry
- Recoverable mineral resources amount to 4,769,901 m3 approximately 9.5 million tons
Name of mineral raw materials Gravel sand
Mountain property base 98.0 m
Coating BSZF 120.0
In just three years, 3.5 million tons of gravel were extracted and sold from the nearby gravel pit.
Note23 ha gravel pit
- Useful material on an area of 22.9333 hectares.
Gravel, siliceous sand - maximum permissible production 4,425,639 m3
Annual recoverable volume 400,000 m3
Planned capacity 50,000 m3 year
Note 6.1 ha - gravel quarry
- Valid mining permit until February 1, 2035.
Mining area 30.6859 hectares of mineral resources,
Siliceous sand 1472 - maximum allowable intake 4,769,901 m3,
Annual production volume 500,000 m3 year
Planned capacity 100,000 m3 year
Geological features of mining areas
Cover a layer of humus from 0.2 to 0.5 meters of raw material
Gravel-sand layer with a thickness of 0.5 to 20.4 meters.
The selling price of this 1st mining package is
9 million euros
2nd mining pack
Mining quarries area
approx. 76.8 ha 3 gravel pits
-The volume of minerals that can be extracted from the mines is 12,182,756 m3.
Mining areas have a valid permit from environmental authorities valid until November 30, 2035.
In just three years, 3.5 million tons of gravel were extracted and sold from the nearby gravelselling price for this second mining package is
12.5 million euros
General information about mining areas
-This gravel mining company has a mining license.
- The groundwater level in each pit is constant and ranges from approximately 1.20 m to 1.60 m from the surface.
Method of extraction in individual areas
-In this region, the rock layer under the mined material lies at a depth of 17 to 22 meters, so up to this height there is gravel.
- Up to a depth of 12 meters, production is carried out by rotary excavators, from a depth of 12 to 22 meters - by floating dredgers.
The total area of developed deposits is approx. 111.8 hectares.
- There is an inventory of machines used in gravel quarries. If buyer-investors are interested in all mines, then, of course, all the machines will be left at the mining site.
Further information on request.