These sand and gravel quarries are located in the Zala district, 10 km from the M85 motorway exit and 28 km from the Hungarian-Austrian border, at 9483 Sopronkövesd.
There are two packages for sale with mining areas of different sizes.
1st mining pack
Mining quarries area:
Note 52 ha – sand quarry:
Mineral Resources: There are currently 5.2 million tonnes of minable sand in the mining area. By expanding the mining area, an additional 6.5 million tons can be obtained.
The permit for burial and disposal of inert waste is in the process of being processed. This provides the possibility of storing, recycling and recycling construction and demolition waste.
Note 30.7 hectares - gravel quarry:
- Recoverable mineral resources amount to 4,769,901 m3 (about 9.5 million tons)
Name of mineral raw materials: Gravel sand
Mountain property base: 98.0 m
Coating BSZF: 120.0
In just three years, 3.5 million tons of gravel were mined and sold from the nearby gravel pit.
Note23 hectares – gravel quarry:
- Useful material on an area of 22.9333 hectares.
Gravel, siliceous sand - maximum allowable production: 4,425,639 m3
Annual recoverable volume: 400,000 m3
Planned capacity: 50,000 m3/year
Note 6.1 hectares - gravel quarry:
- Valid mining permit until February 1, 2035.
Mining area: 30.6859 hectares of mineral resources,
Siliceous sand (1472) - maximum allowable intake: 4,769,901 m3,
Annual production volume: 500,000 m3/year
Planned capacity: 100,000 m3/year
Geological features of mining areas
Covering: layer of humus from 0.2 to 0.5 meters of raw material;
Gravel-sand layer with a thickness of 0.5 to 20.4 meters.
The selling price of this 1st mining package is:
9 million euros
2nd mining pack
Mining quarries area:
approx. 76.8 ha (3 gravel pits)
-Volume of minerals that can be extracted from the mines: 12,182,756 m3.
Mining areas have a valid permit from environmental authorities valid until November 30,just three years, 3.5 million tons of gravel were mined and sold from the nearby gravel pit.
The selling price for this second mining package is:
12.5 million euros
General information about mining areas
-This gravel mining company has a mining license.
- The groundwater level (in each hole) is constant and ranges from approximately 1.20 m to 1.60 m from the surface.
Method of extraction in individual areas
-In this region, the rock layer under the extracted material lies at a depth of 17 to 22 meters, so up to this height there is gravel.
- Up to a depth of 12 meters, production is carried out by rotary excavators, from a depth of 12 to 22 meters - by floating dredgers.
Total area of developed deposits: approx. 111.8 hectares.
- There is an inventory of machines used in gravel quarries. If buyers/investors are interested in all mines, then of course all the machines will be left at the mine site.
Further information on request.
Wir weisen darauf hin, dass zwischen dem Vermittler und dem zu vermittelnden Dritten ein familiäres oder wirtschaftliches Naheverhältnis besteht.