554 400 €
554 400 €
Sale price | 554 400 € |
House Area | 176 m² |
Site plot | 400 m² |
Number of storeys | 2 |
Total number of rooms | 5 |
Number of bedrooms | 4 |
Number of bathrooms | 3 |
Construction phase | New building |
Address | Montenegro, Tivat |
Location | in suburbs |
Business expenses | |
---|---|
Not included in the price |
Credit conditions | |
---|---|
Possible payment by installments |
A new 4-bedroom house in a gated community in the suburb of Tivat, in the village of Kavach.
Arcadia English School and Porto-Montenegro are a 10-minute drive away. Ideal for permanent residence.
The two-storey house is built in the Art Nouveau style with an area of 176 m2 and a plot of 400 m2. The house includes a living room with kitchen and dining area, 4 bedrooms, three bathrooms, two terraces and parking.
Panoramic Windows, spacious rooms, an open gallery between floors with a glass partition, location and beautiful views from the windows make this offer the most interesting for both leisure and permanent residence.
The photo shows a ready-made showroom. Now there is an opportunity to purchase a house in the final stage of construction.
The complex itself is located on a plot of 23,000 m2. and it consists of 30 houses. All houses have panoramic views of the Tivat Bay.
House Features:
-Modern reinforced concrete construction
-Environmental safety and high-quality materials
-Warm energy-efficient houses
-Shockproof panoramic windows
-The ability to plan the interior space for yourself
-Panoramic sea view.
The price includes:
-Interior decoration: parquet/ceramic tiles, walls and ceilings painted white
-Complete exterior decoration: facade, roof, drains
-All engineering systems: electrics, sewerage, water, boilers in bathrooms, air conditioners in the living room and master bedroom, underfloor heating in bathrooms and in the kitchen
-Bathrooms: tiles, sanitary ware
-Terrace in front of the house, parking, path to the entrance to the house
-Land plot: preparation of the soil for planting.
Options for an additional fee:
-Landscape design
-Concreting of additional tracks
- Swimming pool.
The completion of the construction of the 1st stage is in spring 2024. The completion of the construction of the entire village is the end of 2025.