An apartment of 45m2 in a building under construction, on the 1st floor. The apartment has 1 bedroom, a living room with a kitchen, an entrance hall, a bathroom, a terrace. Construction will be completed by August 2025. The apartment is fully finished, with an equipped bathroom, air conditioning. The sea is 120m away! The city center is 20 minutes away at a leisurely pace. Near the school, Aroma, post office, beach.
Additional features
House's or compound's infrastructure and equipment
Only 15 SMART villas in Nusa Dua — at a special price
SMART villas are a unique opportunity to invest in the prestigious Nusa Dua area at a price of only 1.55 billion IDR ($95,000) instead of 1.8 billion IDR ($110,000).
1 bedroom, 34 m2 + private pool
Delivery: 2028
Special offer for 15 SMART villas:
- Special price: 1.55 billion...