560 000 €
560 000 €
Sale price | 560 000 € |
Price per square meter | 13 333 € |
Floor area | 42 m² |
Total number of rooms | 2 |
Number of bedrooms | 1 |
Number of bathrooms | 1 |
Construction phase | New building |
Address | Spain, Benidorm |
Type | Two-room Apartment |
Credit conditions | |
---|---|
Crediting assistance | |
Rate on credit | from 3 up to 4 % |
Bank credit sum | 336 000 € |
Initial fee | 224 000 € |
Panoramic view. Apartment in Benidorm
A stunning new residence that combines contemporary architecture with an attractive Mediterranean lifestyle and nature with calming sea views and the enveloping sound of the coastal waves.
The exclusive 44-storey residential complex in an iconic location will become the tallest skyscraper on the beachfront, forever changing the skyline of Benidorm and creating an iconic composition.
The height of the building is 158 meters. Includes more than 200 apartments and an exclusive hotel overlooking the Mediterranean Sea.
The residence will feature a unique landscape design with Mediterranean-style dunes, luxurious green areas, two large freshwater swimming pools (one of 1,000 m2 exclusively for owners; the other is an outdoor pool in the beach club of about 1,500 m2), a sauna, a spa, a lobby, a gym, a room for yoga and pilates, co-working spaces, tennis and padel courts, a social club, a restaurant, large storage areas and a parking lot with electric charging for about 180 cars. An auditorium and a beach club with three separate areas of grass, sand and wood with direct access to the sandy beach of Poniente. An energy-efficient and environmentally friendly skyscraper in the shape of two sails connected by a mast will have the LEED Gold label.
Payment method:
10,000€ - reserve
20% of the cost + 10% VAT (minus the reserve of 10,000€) - upon signing the purchase and sale agreement.
20% of the cost + 10% VAT - during construction for 3 years (monthly or quarterly payments). Your choice: either 12 quarterly payments or 36 monthly payments.
60% of the cost + 10% VAT - at the notary upon commissioning of the facility.
Completion of construction: September 2027.