
1 896 600 €
1 896 600 €
| Sale price | 1 896 600 € |
| House Area | 159 m² |
| Total number of rooms | 5 |
| Number of bedrooms | 3 |
| Address | Switzerland, Geneva |
159 m² 3 bedrooms 5 rooms
In the heart of the charming village landscape of Lully, awaits you CÔTÉ LULLY, an exclusive project consisting of just two modern townhouses, combining architectural grace, modern comfort and an outstanding quality of life.
This residence is located in a quiet, green residential area, providing privileged proximity to schools, public transport, shops and all necessary amenities.
Designed over three residential levels, this 189.39 m² property captivates with its spacious volumes, exceptional brightness and a layout perfectly suited to family life.
On the ground floor there is a spacious open living area comprising a modern kitchen, dining room and bright living room with access to a private terrace and private garden. Additionally - a guest toilet and storage space.
On the second floor there are two bright bedrooms surrounding a central corridor. Two bathrooms complete this level, providing comfort and functionality.
The ceiling level is completely dedicated to a luxurious master suite with a spacious bedroom, private bathroom and storage space. The attic roofs create a cozy and especially bright atmosphere.
With this property you benefit from a privileged location in the heart of the village of Lulli (Bernex), a unique two-unit development, elegant and modern architecture, and four bedrooms with a private master suite. The floor area is 159.1 m², and the large volumes provide exceptional comfort for the family.
Private terrace and garden, excellent natural light, secure underground parking with car lift and two parking spaces, high energy efficiency, close proximity to schools, shops and public transport make this project unique.
Close access to the center of Geneva and the international airport, the ability to personalize some finishing works depending on the stage of construction, as well as planning permission, all this makes the project a truly rare proposition. Expected delivery is 16-18 months after signing.