
3 106 500 €
3 106 500 €
| Sale price | 3 106 500 € |
| House Area | 200 m² |
| Total number of rooms | 5 |
| Number of bedrooms | 4 |
| Number of bathrooms | 4 |
| Address | Switzerland, Geneva |
200 m² 4 bedrooms 4 bathrooms 5 rooms
Located in a prestigious residential area in Thônex, this modern villa is part of a new exclusive project of three High Energy Performance (HPE) certified villas. The project offers a modern, environmentally friendly and comfortable living environment.
Built on a plot of 408 m², Villa C has approximately 200 m² of living space and almost 300 m² of usable space, divided over three levels. With particular attention to volume, natural light and quality finishes, the villa attracts buyers looking for a new home that combines modern elegance and functionality.
On the ground floor there is a front entrance with built-in wardrobes leading to a spacious living space filled with natural light, with a fully equipped open kitchen connected to a dining area and a spacious living room with a bio fireplace. This space flows naturally to the outside, creating a warm atmosphere. There is also a guest toilet on this level.
On the second floor there is a well-designed sleeping area, including a spacious master suite with a walk-in closet, attached bathroom and direct access to a 5.86 m² balcony. Two children's bedrooms, each with their own shower room, complete the floor. If necessary, you can arrange a fourth bedroom.
In the basement there are additional rooms, including a large games room, storage room, laundry room, technical room and shower room with toilet, which provides additional comfort in everyday life.
Outdoors there is an 8.7 m² terrace and a balcony on the top floor to enjoy sunny days. Two private parking spaces are also included in the villa. Common areas of the project include parking for bicycles and two-wheelers, as well as a designated waste disposal area.
This modern villa with thoughtful finishes offers comfort, energy efficiency and a high quality of life in a privileged environment at the gates of Geneva. Construction is scheduled to begin in the fall, with completion expected in early 2028.