265 500 €
265 500 €
Sale price | 265 500 € |
Price per square meter | 4 370.6 € |
Floor area | 58 m² |
Floor | 2 |
Number of storeys | 8 |
Total number of rooms | 2 |
Number of bedrooms | 1 |
Number of bathrooms | 1 |
Construction phase | Off-plan |
Facility completion deadline | 2025 |
Address | Turkey, Alanya, Tosmur, Tosmur,Alanya |
Location | at the seaside |
to the airport | 36 kilometers |
to the beach | 245 meters |
Type | Two-room Apartment |
Business expenses | |
---|---|
Not included in the price |
Credit conditions | |
---|---|
Possible payment by installments |
Looking for new buildings in Tosmur? Consider an exquisite Scandinavian-style luxury project at the construction stage, which means that it is possible to purchase an apartment in installments without %. The perfect offer for lovers of sandy beaches! This project meets the needs of the most selective real estate connoisseurs and is characterized by the laconic architecture and comfort of an elite five-star hotel. The project is planned on an area of 6678 m2, consists of three 8-storey blocks with a unique location, just 245 meters from the sandy beach.
All apartments are rented with a fine finish, a built-in kitchen set and bathrooms equipped with showers and plumbing. The price of the apartments includes: a smart home system in all apartments, underfloor heating in the bathrooms, an eyeliner for installing a heating system, an additional water filtration system in each apartment. We would like to note that the complex has a covered parking area of more than 6000 m2.
On sale:
- Apartments 1+1, total area from 58 sq.m.
- Apartments 2+ 1, total area from 98 sq.m.
- 2+1 penthouses, total area from 114 sq.m.
- Penthouses 4+1, total area from 231 sq.m.
Life in Tosmur does not stop for a minute, supermarkets, vegetable, grocery and souvenir shops, pharmacies, ATMs, bakeries, as well as other necessary infrastructure are located everywhere. The Dim Chai Mountain River creates a special atmosphere in the area.
Facility infrastructure
The construction of the facility will be completed in February 2025.
Are you interested in this object? Contact our managers for more information.