128 000 €
128 000 €
Sale price | 128 000 € |
Price per square meter | 2 327.27 € |
Floor area | 55 m² |
Number of storeys | 9 |
Total number of rooms | 2 |
Number of bedrooms | 1 |
Number of bathrooms | 1 |
Construction phase | Off-plan |
Facility completion deadline | 2024 |
Address | Turkey, Alanya, Demirtash |
Location | at the seaside, in suburbs |
to the beach | 1200 meters |
to the beach | 35 kilometers |
Type | Two-room Apartment |
Credit conditions | |
---|---|
Possible payment by installments |
The new investment project is located in the city of Alanya in the Demirtas district.
The new residence will be located on an area of 4,227 m2 and will consist of one residential block, 7 floors with a total of 72 apartments.
There are apartments of 1 + 1 49 sq.m., 2 + 1 apartments of 68 sq.m. and 2+1 duplexes from 68 sq.m. -138 sq.m..
All apartments are rented with high-quality finishing, plumbing, kitchen accessories.
The apartments offered are good prospects for investment in the Demirtas area. The apartments can be used for your own recreation, and it is also a great option for long-term or short-term rental.
The territory will be decorated with decorative green spaces and a well-kept garden.
Infrastructure of the complex:Outdoor adult and children's pools
Security system: Fenced and protected area
Round-the-clock video surveillance
Apartment for the porter
Caretaker
Technical characteristics of apartments: According to the project, the interior walls of the apartments are finished with gypsum plaster,
decorated suspended ceilings
Ceramic and marble flooring
Double walls with sound-heat insulation
Interior doors
Armored entrance doors
Double glazed windows, PVC
Internet and central satellite system
Special exterior wall decoration
Built-in kitchen
Granite countertop
Ceramic floor covering
Ceramic wall and floor decoration
Built-in furniture in bathrooms, washbasin, suspended toilet, shower cabin
Boiler
Aluminum railing + glass
Ceramic floors and outdoor lighting
Start of construction – November 2022Completion of construction – November 2024
An interest-free installment payment is offered until the completion of construction.