160 000 €
160 000 €
Sale price | 160 000 € |
Price per square meter | 1 486.49 € |
Floor area | 148 m² |
Floor | 1 |
Number of storeys | 7 |
Total number of rooms | 2 |
Number of bedrooms | 1 |
Number of bathrooms | 1 |
Construction phase | Off-plan |
Facility completion deadline | 2024 |
Address | Turkey, Mersin, Mezetli |
to the beach | 2500 meters |
Type | Two-room Apartment |
Business expenses | |
---|---|
Not included in the price |
The project covers an area of 43,000 m2 and consists of 12 premium class blocks on 5-7 floors.
The total number of apartments is 248.
Apartment layouts:
2+1 (gross area: from 148 to 155 m2),
3+1 (gross area: from 189 m2 to 251 m2)
The main distinguishing feature of this project is the horizontal arrangement of the blocks,
the presence of a citrus and botanical garden (covering an area of 25,000 m2), far from the hustle and bustle of Mersin.
The distance to the most developed and modern Mezitli district of Mersin is
It is a 5-minute drive.
Social project Features:
Lobby (lobby)
Wireless Internet access (wi-fi) throughout the territory
the complex
The code system on the entrance doors
Automatic doors in entrances with a combination
system
Elevators for up to 8 people
Comfort series windows
Decorated halls on the floors
Full-power generator for the entire complex
Drip garden irrigation system
Outdoor and indoor lighting of the entire complex
High-quality landscape design with fountains
Spare water tank
24-hour high-resolution video surveillance system
by extension
Living green fences
Indoor and outdoor parking
Project infrastructure:
Children's playground for outdoor games
Indoor playground for games
A special park for walking and training
pets
Gardens with citrus trees
Outdoor swimming pool
Fitness room
Cafeteria in the pool area
Basketball field
Tennis court
Bike and hiking trails
Outdoor cinema
Cinema and console game room
Mini golf area
Benches for relaxing in gardens
Outdoor chess area
Apartment Features:
❖ Built-in wardrobes in all rooms
❖ Connected communications for the installation of air conditioners
❖ Built-in oven, hob and extractor hood in the kitchen.
Construction starts in November 2022, and completion is scheduled for December 2024.
The developer provides an interest-free installment plan until the end of construction with a 40% down payment.
Facility infrastructure