539 775 €
539 775 €
Both are the area of Alanya closest to the center (10 minutes by public transport). It is famous for its tranquility, but at the same time, it has a very developed infrastructure for living and recreation. It is divided into a lower and upper part. The lower part of the district is adjacent to the sea, there are few new facilities, as there are no vacant land plots - mostly five-storey buildings. Upper Oba is actively being built up with luxury residential complexes with developed infrastructure. There are many supermarkets and large shopping centers in the area. Several private schools and hospitals, parks, playgrounds, football and volleyball fields, tennis courts. Twice a week there is a bazaar with fresh vegetables, fruits and dairy products. A wide landscaped embankment with a bike path, outdoor fitness equipment. Equipped beach. The municipality of Alanya presented a new project of the recreation area "Therapeutic Park". Visitors will be able to enjoy the smells of a variety of tropical plants. There will be cafes, walking and recreation areas, as well as decorative pools. Since a new city hall building is being built in both. The district will become the new administrative center of the city, which will entail an increase in real estate prices.
The complex with its own infrastructure, which is located on a plot of 21,500 m2, consists of eleven five-storey blocks and 202 apartments. Distance 1000 m from the Mediterranean Sea.
The project of the complex includes the following apartment layouts:
Infrastructure of the complex:
Features of the complex:
Round-the-clock video surveillance, fenced landscaped area, large and multifunctional landscaped areas 975 m2 covered social area ( Club 23 ) and 490 m2 outdoor swimming pool for adults and children, 1,600 m2 retail space ( Shops 23 ), 7/24 security and complex management services ( Services 23 ),7/24 uninterrupted electricity supply ( generator ), 278 places in the underground parking.
The complete set of apartments:
According to the project, the interior walls of the apartments are finished with gypsum plaster, decorated suspended ceilings, ceramic granite flooring, double walls with sound and heat insulation, interior doors, steel entrance doors, double glazed windows, built-in kitchen, granite countertops, ceramic flooring, ceramic walls and floors. Built-in furniture in bathrooms, washbasin, suspended toilet, shower, aluminum railing + glass on the balcony, ceramic floors and outdoor lighting. Smart home system, underfloor heating throughout the apartment, video intercom, built-in kitchen appliances (extractor hood, oven, stove), wardrobe in the hallway, outputs for air conditioners in each room. WiFi, satellite TV. 1 parking space will be provided for apartments of layouts 1+1 and 2+1, 2 parking spaces will be provided for apartments of layouts 3+1 and 4+1.
Completion of construction: September 2025.
]>