The project provides for 2,550 apartments, 330 offices and 35 shops in 22 blocks of different storeys. In addition to the internal infrastructure of this large-scale complex, providing comfortable accommodation or recreation, there is a green urban park with an area of 36,500 m2 with a unique landscape design and an artificial river, outdoor fireplaces with recreation areas, picnic areas and much more.
The project of the complex includes apartment layouts from 1 +0 to 4 +1 and provides spacious balconies. All apartments are rented with full finishing: built-in kitchen, countertop, sink, fully equipped bathrooms, windows and balcony doors with double glazing, steel entrance door, interior doors, satellite TV system, etc.
In this complex, linear apartments of 2 +1 layout (two bedrooms and an American-style kitchen-living room) are available for purchase.
Turkish and international schools, medical institutions, shopping centers are located not far from the complex. The distance to Sabiha Gokcen Airport is 27 km, to the bridge over the Bosphorus – 11 km, to the city center – 15 minutes, to the highway – 7 minutes.
Atashehir is a district of Istanbul province, actually a satellite city of this metropolis. It is located in the Asian part of Istanbul, near the junction of the O2 and O4 highways.
Multi-storey housing construction is actively underway in Atashehir. Current plans provide for the construction of complexes designed for residents with high incomes. It is in Atashehir that the offices of many companies are located, and this area is a business center. The city also has opportunities for recreation, in particular, sports.
There are no individual houses in Atashehir, and their construction is not planned.
The district is built according to a single plan. The main axis of the city is the boulevard - Atashehir Boulevards. Atashehir has schools, shopping centers, as well as a large number of various service enterprises. Atashehir is designed for residents who have their own cars, so public transport in the area is not widespread, but there are many parking lots (open and closed).
The construction is carried out in three stages, and completion is planned at the end of 2022.]>