290 000 €
290 000 €
Kargicak is an area of Alanya, located 16 kilometers from the historical center of the city, characterized by low-rise buildings, magnificent mountain air, restaurants with delicious dishes, etc. A lot of foreigners live here, as well as high rental potential. The area is surrounded on all sides by coniferous trees and orchards, thereby creating an atmosphere of tranquility. Due to the height differences and the large number of hills, the apartment windows offer excellent panoramic views.
The complex is located 2 km from the Mediterranean Sea.
It occupies a plot of 7,900 m2 and consists of three six-storey blocks with 64 apartments.
The apartments in this complex deserve attention both for your stay in them and for profitable rental throughout the year, including outside the holiday season.
The project of the complex includes the following apartment layouts:
Linear 1+1 - 49 m2, 2+1 - 67m2
Duplexes with a garden 2+1 - 81 , 86, 95m2, 3+1 - 120,167 m2
Duplex penthouses 2+1 - 102m2 and 3+1 - 135 , 141.147 m2
The infrastructure of the complex:
Outdoor adult and children's pools
Gazebos for relaxation and a barbecue area
Tennis court
Fitness room
Heated indoor swimming pool
Sauna and Jacuzzi
Turkish bath (hammam)
Showers and changing rooms
Massage rooms
Internet in the common area of the project
Children's playground
Indoor and outdoor parking areas
The generator
Features of the complex:
Round-the-clock video surveillance, apartment for the porter, caretaker, generator
The complete set of apartments:
According to the project, the interior walls of the apartments are finished with gypsum plaster, decorated suspended ceilings, ceramic granite flooring, double walls with sound and heat insulation, interior doors, steel entrance doors, double glazed windows, special exterior walls, built-in kitchen, granite countertops, ceramic flooring, ceramic walls and floors. Built-in furniture in bathrooms, washbasin, suspended toilet, shower, boiler, aluminum railing + glass, ceramic floors and outdoor lighting.
Interest-free installments are available until the end of construction.
Construction dates: November 2022 – December 2024.
]>