335 240 €
335 240 €
Sale price | 335 240 € |
House Area | 100 m² |
Number of storeys | 2 |
Number of bathrooms | 3 |
Address | Turkey, Famagusta, Famagusta (Severnyj Kipr) |
Each villa has air conditioning, internet connection, satellite TV, modern decor, spacious living room and fully equipped kitchen. The villas are suitable for those who are looking for a summer vacation near the beach, with daily access to the sea, or who want to escape from the hustle and bustle of city life and immerse themselves in an eternal vacation.
The project of the complex includes the following villa layouts:
In this complex, 2+1 villas are available for purchase (two bedrooms and an American-style kitchen-living room).
All villas are rented with full finishing: built-in kitchen, countertop, sink, fully equipped bathrooms, windows and balcony doors with double glazing, steel entrance door, interior doors, satellite TV system, etc.
When buying, an interest-free installment plan is valid. The project is of interest for investing and increasing your capital, because at the design and construction stage, prices for apartments in the complex are lower than market prices for ready-made objects.
The Bogaz district (Boaz) is located 25 km from Famagusta. Bogaz is famous for its fish restaurants and sandy beaches, so beloved by sea turtles for procreation. Not far from the village there is a Large Old Bazaar, the design of which was developed in the traditional Cypriot style, perfectly fitting into the local architecture.
Bogaz is exactly the place where urbanization seems to have frozen in the air, and people continue to live in the same way as they did decades ago, in a calm and measured pace of life, enjoying every day given to them. In Bogaz, you can buy fresh fish in a small harbor, by all means haggling first with an angler, have dinner at one of the many fish restaurants, stroll through the green hills, or climb the Kantara mountain castle, which was built in the 10th century as a surveillance post for the surroundings in case of an enemy attack.
Construction will be completed in 2025.
]>